Resources

FF&E schedule template for hotel and interior projects

An FF&E schedule lists every piece of furniture, fixture and equipment in a project, one row per item, with where it goes, what it is, who makes it, how many, what it costs and where it stands. Download the template below, free and with no sign-up, then read what each column is for.

The columns, and what each is for

ColumnWhat goes in itWhy it matters
RefA code per item, such as GR-01 for the first guest-room pieceThe one name the drawings, the budget and the maker’s order all use
AreaThe room or area: King guest room, Lobby, RestaurantHotels repeat rooms, so quantities follow the room count
ItemWhat it is: Bed, Desk chair, Floor lampRead at a glance in a client meeting
DescriptionWhat makes it this item: size, construction, special requirementsWhat the maker prices against
MakerThe manufacturer or workshopWhere the request for quotation goes
Product codeThe maker’s own codeStops the wrong variant being ordered
FinishFabric, timber, metal, colour, with the maker’s finish codesThe most common source of a wrong delivery
DimensionsW x D x H in millimetresChecked against the drawings
Quantity per area, areas, total quantityHow many in one room, how many rooms, and the product of the twoA room count that changes moves every line at once
Unit price, currency, line totalThe quoted price per unit and the totalFeeds the budget
Price statusQuoted, estimated or to confirmA budget built on estimates should say so
Lead timeWeeks from order to deliveryDrives the programme and the order dates
Fire and safetyThe standard the item meets, such as the local fire test for upholsteryHotels and public areas are checked against it
StatusConcept, specified, approved, ordered, delivered, installedWhere every item stands, in one column
NotesAnything a person needs to knowOpen questions stay visible

How to use it on a hotel project

  1. Fill one room type at a time. A 40-key hotel with two room types is two short lists, not 40 long ones.
  2. Put the number of rooms in Areas. The total quantity follows, so a change from 34 to 36 kings is one cell.
  3. Leave a price empty and set Price status to “to confirm” until a maker has quoted. An empty cell is honest; a guessed number in a client budget is not.
  4. Keep public areas (lobby, restaurant, bar, spa) as their own areas, since their items are rarely repeated.
  5. Send each maker only their rows. Filter by Maker, and that is the request for quotation.

The worked example

The second sheet fills one King guest room of The Saltmarsh Hotel, an invented 40-key hotel we use for samples. The quantities and finishes are examples, the makers are left as “to confirm”, and there are no prices: it shows how the columns fill, not what a room costs. For what rooms cost, see how hotel FF&E budgets are set per key.

The same schedule, filled from your project

Nodejam’s interior design project workflow fills these columns from the project’s own files, then makes the budget, the programme and one request for quotation per maker from the same rows, so the numbers agree across every file.